{"id":8717593,"date":"2023-01-16T13:45:19","date_gmt":"2023-01-16T21:45:19","guid":{"rendered":"https:\/\/www.eastbaytimes.com\/?p=8717593&#038;preview=true&#038;preview_id=8717593"},"modified":"2023-01-17T05:31:05","modified_gmt":"2023-01-17T13:31:05","slug":"good-samaritan-san-jose-higher-medical-hospital-building-expand-build","status":"publish","type":"post","link":"https:\/\/www.eastbaytimes.com\/2023\/01\/16\/good-samaritan-san-jose-higher-medical-hospital-building-expand-build\/","title":{"rendered":"Good Samaritan eyes big hospital bed increase with San Jose expansion"},"content":{"rendered":"<p>SAN JOSE \u2014 Good Samaritan is eyeing a big increase in hospital beds as part of its plan to triple the size of its existing healthcare campus in San Jose.<\/p>\n<p>At present, Good Sam hospital accommodates 273 beds on the grounds of the healthcare organization\u2019s campus at 2425 Samaritan Drive in southwest San Jose.<\/p>\n<p>Once complete, the new campus would contain 419 beds, according to plans on file with San Jose city officials.<\/p>\n<p>\u201cHCA seeks a new planned development zoning to replace the existing zoning to address seismic retrofit requirements as required by Senate Bill 1953, to modernize hospital facilities and to improve access to comprehensive healthcare for the growing population,\u201d Elizabeth Cobb, a senior project manager with Kimberly-Horn, a planning consultant for HCA for the hospital expansion.<\/p>\n<figure id=\"attachment_9702297\"  class=\"wp-caption alignnone size-article_inline\"><img decoding=\"async\" class=\" lazyautosizes lazyload\" src=\"https:\/\/i0.wp.com\/www.mercurynews.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-02.jpg?fit=620%2C9999px&amp;ssl=1\" alt=\"New medical center building at Good Samaritan Hospital, street-level view, 2425 Samaritan Drive in San Jose, concept. (HCA Healthcare)\" width=\"969\" data-sizes=\"auto\" data-src=\"https:\/\/i0.wp.com\/www.mercurynews.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-02.jpg?fit=620%2C9999px&amp;ssl=1\" data-srcset=\"https:\/\/i0.wp.com\/www.mercurynews.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-02.jpg?fit=620%2C9999px&amp;ssl=1 620w,https:\/\/i0.wp.com\/www.mercurynews.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-02.jpg?fit=780%2C9999px&amp;ssl=1 780w,https:\/\/i0.wp.com\/www.mercurynews.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-02.jpg?fit=810%2C9999px&amp;ssl=1 810w,https:\/\/i0.wp.com\/www.mercurynews.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-02.jpg?fit=1280%2C9999px&amp;ssl=1 1280w,https:\/\/i0.wp.com\/www.mercurynews.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-02.jpg?fit=1860%2C9999px&amp;ssl=1 1860w\" \/><figcaption class=\"wp-caption-text\">New medical center building at Good Samaritan Hospital, street-level view, 2425 Samaritan Drive in San Jose, concept.&nbsp;<\/figcaption><\/figure>\n<p>The total building area at the future Good Samaritan medical complex would be slightly under 1.37 million square feet, compared with the current campus which totals 450,700 square feet, the city plans show.<\/p>\n<p>That\u2019s slightly more than three times the size of the existing campus, according to the plans filed by Good Samaritan Hospital, whose owner is Tennessee-based HCA Healthcare.<\/p>\n<p>The project also envisions an interim size for the campus. In the interim phase, the Good Sam complex would total 378 beds and consist of 710,700 square feet.<\/p>\n<p>The existing Good Sam complex provides 1,031 parking stalls. The proposal would eventually create a complex with 2,422 stalls.<\/p>\n<p>Good Sam and HCA Healthcare want city officials to completely rezone the entire 21-acre site that accommodates the existing hospital as well as the future expansion buildings and parking facilities.<\/p>\n<p>In its final phase, the project would add a medical office building totaling 200,000 square feet.<\/p>\n<p>The expansion project is being undertaken largely to comply with the requirements of SB 1953 which obliges all hospital buildings to meet certain seismic safety requirements by a deadline.<\/p>\n<p>Among other key changes that would arise from this proposal, once the expansion is complete:<\/p>\n<ul>\n<li>The existing main building would no longer provide general acute care services by Jan. 1, 2030.<\/li>\n<li>The women\u2019s and children\u2019s center may continue to provide general acute care services after Jan. 1, 2030.<\/li>\n<li>An existing daycare center totaling 7,000 square feet would no longer exist on site after the expansion is complete.<\/li>\n<\/ul>\n<p>\u201cReconfiguration of Good Samaritan Hospital needs to consider and evaluate expansion options of the diagnostic and treatment functions, new medical offices and backfilling the existing main hospital building with ancillary support services so as to provide for a comprehensive healthcare campus,\u201d HCA and Good Sam stated in the planning documents.<\/p>\n<p>The hospital rooms in the new main medical center are likely to be considerably larger than the existing rooms.<\/p>\n<p>\u201cCurrently, Good Samaritan Hospital does not have any private patient rooms,\u201d Good Sam and HCA stated in the planning documents. \u201cToday, private patient rooms are the norm and are now recommended\u201d in the Facility Guidelines Institute recommendations for the design and construction of healthcare facilities.<\/p>\n<p>In addition to private and bigger rooms at hospitals, operating rooms, as well as diagnostic and treatment departments, have become larger, the planning documents stated.<\/p>\n<p><aside class=\"related left\"><h2 class=\"widget-title\" data-curated-ids=\"\" data-relation-type=\"automatic-primary-tag\">Related Articles<\/h2><ul><li>\n\n<div class=\"entry-section\"><a href=\"https:\/\/www.eastbaytimes.com\/business\/\">Business | <\/a><\/div>\t\t\t<a class=\"article-title\" href=\"https:\/\/www.eastbaytimes.com\/2023\/01\/17\/google-san-jose-downtown-village-tech-history-patty-inn-iron-work\/\" title=\"Google salvages and adapts older parts of downtown San Jose village\">\n\t\n\t\t\t\t<span class=\"dfm-title premium\">\n\t\t\tGoogle transit village historic building work pushes ahead in downtown San Jose\t\t<\/span>\n\n\t\t\t<\/a>\n\t\n<\/li><li>\n\n<div class=\"entry-section\"><a href=\"https:\/\/www.eastbaytimes.com\/business\/\">Business | <\/a><\/div>\t\t\t<a class=\"article-title\" href=\"https:\/\/www.eastbaytimes.com\/2023\/01\/13\/downtown-san-jose-tower-china-real-estate-develop-sale-home-housing\/\" title=\"Downtown San Jose housing site owned by Chinese real estate firm goes up for sale\">\n\t\n\t\t\t\t<span class=\"dfm-title premium\">\n\t\t\tDowntown San Jose housing site owned by Chinese real estate firm goes up for sale\t\t<\/span>\n\n\t\t\t<\/a>\n\t\n<\/li><li>\n\n<div class=\"entry-section\"><a href=\"https:\/\/www.eastbaytimes.com\/business\/\">Business | <\/a><\/div>\t\t\t<a class=\"article-title\" href=\"https:\/\/www.eastbaytimes.com\/2023\/01\/11\/san-ramon-san-francisco-pac-12-real-estate-lease-bishop-ranch-office\/\" title=\"Pac-12 production unit will move to San Ramon and exit San Francisco\">\n\t\n\t\t\t\t<span class=\"dfm-title premium\">\n\t\t\tPac-12 production center will move to East Bay and exit S.F.\t\t<\/span>\n\n\t\t\t<\/a>\n\t\n<\/li><li>\n\n<div class=\"entry-section\"><a href=\"https:\/\/www.eastbaytimes.com\/business\/\">Business | <\/a><\/div>\t\t\t<a class=\"article-title\" href=\"https:\/\/www.eastbaytimes.com\/2023\/01\/11\/oakland-east-bay-office-vacancy-rent-rise-year-end-real-estate-build\/\" title=\"Oakland-area office vacancies rise at year\u2019s end \u2014 so do rents\">\n\t\n\t\t\t\t<span class=\"dfm-title premium\">\n\t\t\tEast Bay office vacancies rise at year\u2019s end \u2014 so do rents\t\t<\/span>\n\n\t\t\t<\/a>\n\t\n<\/li><li>\n\n<div class=\"entry-section\"><a href=\"https:\/\/www.eastbaytimes.com\/business\/\">Business | <\/a><\/div>\t\t\t<a class=\"article-title\" href=\"https:\/\/www.eastbaytimes.com\/2023\/01\/11\/silicon-valley-san-jose-office-tech-job-real-estate-facebook-twitter\/\" title=\"Silicon Valley office vacancy rises, rents flatten, big leases vanish\">\n\t\n\t\t\t\t<span class=\"dfm-title premium\">\n\t\t\tSilicon Valley office vacancies swell amid tech cutbacks\t\t<\/span>\n\n\t\t\t<\/a>\n\t\n<\/li><\/ul><\/aside>\u201cThe project buildout condition would substantially maintain the existing buildings to the maximum extent possible,\u201d HCA and Good Sam stated. \u201cThe project assumes growth will occur in phases so as to maintain the beds and facility operations without the downtime of critical services.\u201d<\/p>\n<p>The project\u2019s initial phase would be the expansion of the diagnostic and treatment functions, and to shift some support services to the existing main hospital building, the planning documents state.<\/p>\n<p>Construction of the first phase of the expansion should be complete by 2029, according to the proposal.<\/p>\n<p>\u201cThe proposed improvements are necessary to allow HCA to continue providing high-quality care to the community,\u201d Cobb wrote in the project overview.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Good Samaritan is eyeing a big increase in hospital beds at its San Jose health care campus.<\/p>\n","protected":false},"author":663,"featured_media":8717594,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"subheadline":"Health care complex will have well over 400 beds once Good Sam project is complete","jetpack_publicize_message":"","jetpack_is_tweetstorm":false,"jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":[]},"categories":[162,182,177,187,10111,161],"tags":[200,9935,11204,48735,10050],"feature":[10000],"location":[3,2,114,102,7],"type-of-work":[50053],"jetpack_publicize_connections":[],"post_status":"","edit_last":0,"edit_lock":0,"highlights":"","original_byline":"","original_canonical":"","original_category":"","original_email":"","original_id":0,"original_pubdate":"","original_source":"","primary_section":"162","primary_tag":200,"print_workflow_body":{"deck_headline":"","print_title":"","print_subheadline":"","print_priority":"","print_placement":"cover","print_edition_date":"","print_pub_date":"","print_slug":"","print_content":"","print_budget_line":"","print_excerpt":"","print_notes":"","print_featured_gallery_richtext":"","print_inline_galleries_richtext":"","print_inline_images_richtext":""},"print_workflow_exported_ts":"","print_workflow_exported_username":"","print_workflow_shapes":"","print_workflow_side":{"print_section":52021,"print_status":9425,"add_export_buttons":""},"really_short_title":"Good Samaritan expansion","short_title":"","market_neutral_title":"","social_title":"","dfm_hub_post_id":0,"paywall_level":"premium","featured_media_content":{"content_type":"image","content":{"id":8717594,"title":"SJM-L-SJGOODSAM-x-01","filename":"SJM-L-SJGOODSAM-x-01-1.jpg","url":"https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg","link":"https:\/\/www.eastbaytimes.com\/2023\/01\/16\/good-samaritan-san-jose-higher-medical-hospital-building-expand-build\/sjm-l-sjgoodsam-x-01-4\/","alt":"","author":"878","description":"","caption":"Good Samaritan Hospital new medical center complex, elevated view, 2425 Samaritan Drive in San Jose, concept. \n(HCA Healthcare)\n","name":"sjm-l-sjgoodsam-x-01-4","status":"inherit","uploadedTo":8717593,"date":1673905535000,"modified":1673905535000,"menuOrder":0,"mime":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/www.eastbaytimes.com\/wp-includes\/images\/media\/default.png","dateFormatted":"January 16, 2023","nonces":{"update":false,"delete":false,"edit":false},"editLink":false,"meta":false,"authorName":"gqlshare","authorLink":"","uploadedToTitle":"Good Samaritan eyes big hospital bed increase with San Jose expansion","uploadedToLink":null,"filesizeInBytes":800631,"filesizeHumanReadable":"782 KB","context":"","height":1308,"width":2000,"orientation":"landscape","sizes":{"thumbnail":{"height":"150","width":"150","url":"https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg?w=150&h=150&crop=1","orientation":"landscape"},"medium":{"height":196,"width":300,"url":"https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg?w=300","orientation":"landscape"},"large":{"height":670,"width":1024,"url":"https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg?w=1024","orientation":"landscape"},"full":{"url":"https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg","height":1308,"width":2000,"orientation":"landscape"}},"credit":"(HCA Healthcare)","custom_caption":"Good Samaritan Hospital new medical center complex, elevated view, 2425 Samaritan Drive in San Jose, concept. \n(HCA Healthcare)\n"},"data":[{"id":8717594,"title":"SJM-L-SJGOODSAM-x-01","filename":"SJM-L-SJGOODSAM-x-01-1.jpg","url":"https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg","link":"https:\/\/www.eastbaytimes.com\/2023\/01\/16\/good-samaritan-san-jose-higher-medical-hospital-building-expand-build\/sjm-l-sjgoodsam-x-01-4\/","alt":"","author":"878","description":"","caption":"Good Samaritan Hospital new medical center complex, elevated view, 2425 Samaritan Drive in San Jose, concept. \n(HCA Healthcare)\n","name":"sjm-l-sjgoodsam-x-01-4","status":"inherit","uploadedTo":8717593,"date":1673905535000,"modified":1673905535000,"menuOrder":0,"mime":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/www.eastbaytimes.com\/wp-includes\/images\/media\/default.png","dateFormatted":"January 16, 2023","nonces":{"update":false,"delete":false,"edit":false},"editLink":false,"meta":false,"authorName":"gqlshare","authorLink":"","uploadedToTitle":"Good Samaritan eyes big hospital bed increase with San Jose expansion","uploadedToLink":null,"filesizeInBytes":800631,"filesizeHumanReadable":"782 KB","context":"","height":1308,"width":2000,"orientation":"landscape","sizes":{"thumbnail":{"height":"150","width":"150","url":"https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg?w=150&h=150&crop=1","orientation":"landscape"},"medium":{"height":196,"width":300,"url":"https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg?w=300","orientation":"landscape"},"large":{"height":670,"width":1024,"url":"https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg?w=1024","orientation":"landscape"},"full":{"url":"https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg","height":1308,"width":2000,"orientation":"landscape"}},"credit":"(HCA Healthcare)","custom_caption":"Good Samaritan Hospital new medical center complex, elevated view, 2425 Samaritan Drive in San Jose, concept. \n(HCA Healthcare)\n"}],"rendered_content":"<img width=\"150\" height=\"150\" src=\"https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg\" class=\"attachment-thumbnail size-thumbnail lazyload\" alt=\"\" decoding=\"async\" loading=\"lazy\" draggable=\"false\" data-sizes=\"auto\" data-srcset=\"https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg?w=2000 2000w,https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg?w=640 640w,https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg?w=800 800w,https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg?w=1040 1040w,https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg?w=1280 1280w\" data-src=\"https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg\" \/>"},"attachments":[{"ID":8717594,"post_author":878,"post_name":"sjm-l-sjgoodsam-x-01-4","post_type":"attachment","post_title":"SJM-L-SJGOODSAM-x-01","post_date":"2023-01-16 13:45:35","post_date_gmt":"2023-01-16 21:45:35","post_excerpt":"Good Samaritan Hospital new medical center complex, elevated view, 2425 Samaritan Drive in San Jose, concept. \n(HCA Healthcare)\n","post_status":"inherit","post_parent":8717593,"post_modified":"2023-01-16 13:45:35","post_modified_gmt":"2023-01-16 21:45:35","guid":"https:\/\/www.eastbaytimes.com\/?attachment_id=8717594","post_mime_type":"image\/jpeg","custom_caption":"Good Samaritan Hospital new medical center complex, elevated view, 2425 Samaritan Drive in San Jose, concept. \n(HCA Healthcare)\n","credit":"(HCA Healthcare)","prepared_image":{"id":8717594,"title":"SJM-L-SJGOODSAM-x-01","filename":"SJM-L-SJGOODSAM-x-01-1.jpg","url":"https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg","link":"https:\/\/www.eastbaytimes.com\/2023\/01\/16\/good-samaritan-san-jose-higher-medical-hospital-building-expand-build\/sjm-l-sjgoodsam-x-01-4\/","alt":"","author":"878","description":"","caption":"Good Samaritan Hospital new medical center complex, elevated view, 2425 Samaritan Drive in San Jose, concept. \n(HCA Healthcare)\n","name":"sjm-l-sjgoodsam-x-01-4","status":"inherit","uploadedTo":8717593,"date":1673905535000,"modified":1673905535000,"menuOrder":0,"mime":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/www.eastbaytimes.com\/wp-includes\/images\/media\/default.png","dateFormatted":"January 16, 2023","nonces":{"update":false,"delete":false,"edit":false},"editLink":false,"meta":false,"authorName":"gqlshare","authorLink":"","uploadedToTitle":"Good Samaritan eyes big hospital bed increase with San Jose expansion","uploadedToLink":null,"filesizeInBytes":800631,"filesizeHumanReadable":"782 KB","context":"","height":1308,"width":2000,"orientation":"landscape","sizes":{"thumbnail":{"height":"150","width":"150","url":"https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg?w=150&h=150&crop=1","orientation":"landscape"},"medium":{"height":196,"width":300,"url":"https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg?w=300","orientation":"landscape"},"large":{"height":670,"width":1024,"url":"https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg?w=1024","orientation":"landscape"},"full":{"url":"https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg","height":1308,"width":2000,"orientation":"landscape"}}}}],"authors":[{"ID":482,"display_name":"George Avalos","description":"George Avalos is a business reporter for the Bay Area News Group.","first_name":"George","last_name":"Avalos","user_nicename":"george-avalos","user_login":"george-avalos","user_email":"gavalos@bayareanewsgroup.com","type":"guest-author","linked_account":0,"website":"http:\/\/www.eastbaytimes.com","twitter":"georgeavalos","facebook":"","google_plus":""}],"taxonomies":{"category":[{"term_id":162,"name":"Business","slug":"business","term_group":0,"term_taxonomy_id":162,"taxonomy":"category","description":"","parent":0,"count":52703,"filter":"raw"},{"term_id":182,"name":"California News","slug":"california","term_group":0,"term_taxonomy_id":182,"taxonomy":"category","description":"","parent":161,"count":76033,"filter":"raw"},{"term_id":177,"name":"Economy","slug":"economy","term_group":0,"term_taxonomy_id":177,"taxonomy":"category","description":"","parent":162,"count":8174,"filter":"raw"},{"term_id":187,"name":"Health","slug":"health","term_group":0,"term_taxonomy_id":187,"taxonomy":"category","description":"","parent":161,"count":18350,"filter":"raw"},{"term_id":10111,"name":"Latest Headlines","slug":"latest-headlines","term_group":0,"term_taxonomy_id":10111,"taxonomy":"category","description":"","parent":0,"count":126500,"filter":"raw"},{"term_id":161,"name":"News","slug":"news","term_group":0,"term_taxonomy_id":161,"taxonomy":"category","description":"","parent":0,"count":902962,"filter":"raw"}],"post_tag":[{"term_id":200,"name":"Commercial Real Estate","slug":"commercial-real-estate","term_group":0,"term_taxonomy_id":200,"taxonomy":"post_tag","description":"","parent":0,"count":1970,"filter":"raw"},{"term_id":9935,"name":"Development","slug":"development","term_group":0,"term_taxonomy_id":9935,"taxonomy":"post_tag","description":"","parent":0,"count":2424,"filter":"raw"},{"term_id":11204,"name":"Health Care","slug":"health-care","term_group":0,"term_taxonomy_id":11204,"taxonomy":"post_tag","description":"","parent":0,"count":3704,"filter":"raw"},{"term_id":48735,"name":"PM report","slug":"pm-report","term_group":0,"term_taxonomy_id":48735,"taxonomy":"post_tag","description":"","parent":0,"count":18634,"filter":"raw"},{"term_id":10050,"name":"Real Estate","slug":"real-estate","term_group":0,"term_taxonomy_id":10050,"taxonomy":"post_tag","description":"","parent":0,"count":3349,"filter":"raw"}],"location":[{"term_id":3,"name":"Bay Area","slug":"bay-area","term_group":0,"term_taxonomy_id":3,"taxonomy":"location","description":"","parent":2,"count":228796,"filter":"raw"},{"term_id":2,"name":"California","slug":"california","term_group":0,"term_taxonomy_id":2,"taxonomy":"location","description":"","parent":0,"count":250672,"filter":"raw"},{"term_id":114,"name":"San Jose","slug":"san-jose","term_group":0,"term_taxonomy_id":114,"taxonomy":"location","description":"","parent":102,"count":16076,"filter":"raw"},{"term_id":102,"name":"Santa Clara County","slug":"santa-clara-county","term_group":0,"term_taxonomy_id":102,"taxonomy":"location","description":"","parent":7,"count":34823,"filter":"raw"},{"term_id":7,"name":"South Bay","slug":"south-bay","term_group":0,"term_taxonomy_id":7,"taxonomy":"location","description":"","parent":3,"count":37026,"filter":"raw"}],"feature":[{"term_id":10000,"name":"Biz Break","slug":"biz-break","term_group":0,"term_taxonomy_id":10000,"taxonomy":"feature","description":"","parent":0,"count":5974,"filter":"raw"}]},"featured_media_array":{"id":8717594,"title":"SJM-L-SJGOODSAM-x-01","filename":"SJM-L-SJGOODSAM-x-01-1.jpg","url":"https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg","link":"https:\/\/www.eastbaytimes.com\/2023\/01\/16\/good-samaritan-san-jose-higher-medical-hospital-building-expand-build\/sjm-l-sjgoodsam-x-01-4\/","alt":"","author":"878","description":"","caption":"Good Samaritan Hospital new medical center complex, elevated view, 2425 Samaritan Drive in San Jose, concept. \n(HCA Healthcare)\n","name":"sjm-l-sjgoodsam-x-01-4","status":"inherit","uploadedTo":8717593,"date":1673905535000,"modified":1673905535000,"menuOrder":0,"mime":"image\/jpeg","type":"image","subtype":"jpeg","icon":"https:\/\/www.eastbaytimes.com\/wp-includes\/images\/media\/default.png","dateFormatted":"January 16, 2023","nonces":{"update":false,"delete":false,"edit":false},"editLink":false,"meta":false,"authorName":"gqlshare","authorLink":"","uploadedToTitle":"Good Samaritan eyes big hospital bed increase with San Jose expansion","uploadedToLink":null,"filesizeInBytes":800631,"filesizeHumanReadable":"782 KB","context":"","height":1308,"width":2000,"orientation":"landscape","sizes":{"thumbnail":{"height":"150","width":"150","url":"https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg?w=150&h=150&crop=1","orientation":"landscape"},"medium":{"height":196,"width":300,"url":"https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg?w=300","orientation":"landscape"},"large":{"height":670,"width":1024,"url":"https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg?w=1024","orientation":"landscape"},"full":{"url":"https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg","height":1308,"width":2000,"orientation":"landscape"}},"credit":"(HCA Healthcare)","custom_caption":"Good Samaritan Hospital new medical center complex, elevated view, 2425 Samaritan Drive in San Jose, concept. \n(HCA Healthcare)\n"},"parsely":{"version":"1.1.0","meta":{"@context":"https:\/\/schema.org","@type":"NewsArticle","headline":"Good Samaritan eyes big hospital bed increase with San Jose expansion","url":"https:\/\/www.eastbaytimes.com\/2023\/01\/16\/good-samaritan-san-jose-higher-medical-hospital-building-expand-build\/","mainEntityOfPage":{"@type":"WebPage","@id":"https:\/\/www.eastbaytimes.com\/2023\/01\/16\/good-samaritan-san-jose-higher-medical-hospital-building-expand-build\/"},"thumbnailUrl":"https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg?w=150","image":{"@type":"ImageObject","url":"https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg?w=1024"},"articleSection":"Other","author":[{"@type":"Person","name":"George Avalos"}],"creator":["George Avalos"],"publisher":{"@type":"Organization","name":"East Bay Times","logo":"https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2016\/10\/32x32-ebt.png"},"keywords":["commercial real estate","development","health care","pm report","real estate"],"dateCreated":"2023-01-16T21:45:19Z","datePublished":"2023-01-16T21:45:19Z","dateModified":"2023-01-17T13:31:05Z"},"rendered":"<script type=\"application\/ld+json\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@type\":\"NewsArticle\",\"headline\":\"Good Samaritan eyes big hospital bed increase with San Jose expansion\",\"url\":\"https:\\\/\\\/www.eastbaytimes.com\\\/2023\\\/01\\\/16\\\/good-samaritan-san-jose-higher-medical-hospital-building-expand-build\\\/\",\"mainEntityOfPage\":{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.eastbaytimes.com\\\/2023\\\/01\\\/16\\\/good-samaritan-san-jose-higher-medical-hospital-building-expand-build\\\/\"},\"thumbnailUrl\":\"https:\\\/\\\/www.eastbaytimes.com\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/SJM-L-SJGOODSAM-x-01-1.jpg?w=150\",\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.eastbaytimes.com\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/SJM-L-SJGOODSAM-x-01-1.jpg?w=1024\"},\"articleSection\":\"Other\",\"author\":[{\"@type\":\"Person\",\"name\":\"George Avalos\"}],\"creator\":[\"George Avalos\"],\"publisher\":{\"@type\":\"Organization\",\"name\":\"East Bay Times\",\"logo\":\"https:\\\/\\\/www.eastbaytimes.com\\\/wp-content\\\/uploads\\\/2016\\\/10\\\/32x32-ebt.png\"},\"keywords\":[\"commercial real estate\",\"development\",\"health care\",\"pm report\",\"real estate\"],\"dateCreated\":\"2023-01-16T21:45:19Z\",\"datePublished\":\"2023-01-16T21:45:19Z\",\"dateModified\":\"2023-01-17T13:31:05Z\"}<\/script>","tracker_url":"https:\/\/cdn.parsely.com\/keys\/eastbaytimes.com\/p.js"},"jetpack_featured_media_url":"https:\/\/www.eastbaytimes.com\/wp-content\/uploads\/2023\/01\/SJM-L-SJGOODSAM-x-01-1.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p7ShK5-AzQl","amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.eastbaytimes.com\/wp-json\/wp\/v2\/posts\/8717593"}],"collection":[{"href":"https:\/\/www.eastbaytimes.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eastbaytimes.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eastbaytimes.com\/wp-json\/wp\/v2\/users\/663"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eastbaytimes.com\/wp-json\/wp\/v2\/comments?post=8717593"}],"version-history":[{"count":6,"href":"https:\/\/www.eastbaytimes.com\/wp-json\/wp\/v2\/posts\/8717593\/revisions"}],"predecessor-version":[{"id":8717979,"href":"https:\/\/www.eastbaytimes.com\/wp-json\/wp\/v2\/posts\/8717593\/revisions\/8717979"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eastbaytimes.com\/wp-json\/wp\/v2\/media\/8717594"}],"wp:attachment":[{"href":"https:\/\/www.eastbaytimes.com\/wp-json\/wp\/v2\/media?parent=8717593"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eastbaytimes.com\/wp-json\/wp\/v2\/categories?post=8717593"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eastbaytimes.com\/wp-json\/wp\/v2\/tags?post=8717593"},{"taxonomy":"feature","embeddable":true,"href":"https:\/\/www.eastbaytimes.com\/wp-json\/wp\/v2\/feature?post=8717593"},{"taxonomy":"location","embeddable":true,"href":"https:\/\/www.eastbaytimes.com\/wp-json\/wp\/v2\/location?post=8717593"},{"taxonomy":"type-of-work","embeddable":true,"href":"https:\/\/www.eastbaytimes.com\/wp-json\/wp\/v2\/type-of-work?post=8717593"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}